| Trail work, Volunteer

On Saturday morning, a team of six volunteers built a new bridge over a section of trail on Rollercoaster Extension that continually washed out. The original trail went over a section of large, terracotta pipes that over time, filled with dirt and sediment, blocking the flow of water and causing the tread to flood.

The team dug up the pieces of pipe (three in all), which were huge! Each piece was removed and repurposed as trail markers (see the last picture below). The ravine was dug out further to ensure that the water flowed continuously down the trail.

After removing the pipe and clearing the pathway, the team dug ditches for the footers, secured the support beams, and screwed in the decking. A few hikers and bikers came through to test new bridge, which held beautifully!

The old drain pipes were added as trail markers, promoting reuse and adding some local charm. This bridge ensures that walkers, hikers, and bikers can safely cross this area, and that water will not erode the trail. Thank you to the volunteers that came out today! These projects are not capable without you.

Comments are closed.